Skip to main content
Archives
About the NRAO/AUI Archives
NRAO/AUI Archives Policy
Finding Aids to the Collections
Home
Search for Items
How to Search
Popular Searches
Contact Us
About the NRAO/AUI Archives
NRAO/AUI Archives Policy
Finding Aids to the Collections
Home
Search for Items
How to Search
Popular Searches
Contact Us
Papers of Barry G. Clark > Green Bank Interferometer Series
Collection Items
Phase Drifts in Interferometer Observations of Point Sources, 1964
Description:
Interferometer reports
Start Date:
1964-10-00
A Method for Finding the Phase and Amplitude of Interferometer Fringe Patterns, 1964
Description:
Interferometer reports
Start Date:
1964-11-00
NRAO Interferometers: Design, Operation, and Early Results, 1964
Description:
Interferometer reports
Start Date:
1964-11-00
NRAO Interferometer: The Delay Switching Computer, 1964
Description:
Interferometer reports
Start Date:
1964-11-00
Questions for Ad Hoc Discussion Group on the Parameters for a Very-Large Antenna Array, 1964
Description:
Interferometer reports
Start Date:
1964-11-18
A Digital Cross-Correlation Interferometer, 1964
Description:
Interferometer reports
Start Date:
1964-12-01
The Response of One or More Interferometers, 1964
Description:
Interferometer reports
Start Date:
1964-12-07
Geometrical Aspects of Interferometry, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
On the Reduction of Digital Interferometer Records, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
Refraction, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
Interferometer Calibration and Source Position Measurement Using Long-Run Phase Behavior, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
On the Phase Center of a Paraboloid, 1964
Description:
Interferometer reports
Start Date:
1964-12-00
Interferometer Tape Master Files, 1965
Description:
Interferometer reports
Start Date:
1965-01-05
Technical Considerations Concerning the Location of a Third 85-Foot Telescope and an Interferometer Control Building, 1965
Description:
Interferometer reports
Start Date:
1965-01-11
The Value of B1 for Interferometer Baseline 2, 1965
Description:
Interferometer reports
Start Date:
1965-01-00
Interferometer Constants Predicted from the Survey Data, 1965
Description:
Interferometer reports
Start Date:
1965-01-00
Fitting Source Models to Interferometric Observations, I, 1965
Description:
Interferometer reports
Start Date:
1965-02-00
Interferometer Calibrations and Source Position Measurements on Baseline 2, 1965
Description:
Interferometer reports
Start Date:
1965-03-00
Sources of Error in Position Observations with the NRAO Interferometer, 1965
Description:
Interferometer reports
Start Date:
1965-03-18
Interferometer Digital Output System, 1965
Description:
Interferometer reports
Start Date:
1965-04-00
The Interferometer Fringe Reduction Program - Version II, 1965
Description:
Interferometer reports
Start Date:
1965-04-00
The Values of B1 and B3 for Interferometer Baseline 2, 1965
Description:
Interferometer reports
Start Date:
1965-04-00
Accurate Radio Source Position Measurements with the NRAO Interferometer, 1965
Description:
Interferometer reports
Start Date:
1965-07-00
Position Measurements and Baseline Constants, Baseline 5, 1965
Description:
Interferometer reports
Start Date:
1965-07-12
A Survery of Delay Line Techniques, 1965
Description:
Interferometer reports
Start Date:
1965-08-00
The Interferometer Averaging Program - AVGI, 1966
Description:
Interferometer reports
Start Date:
1966-06-06
Gain Calibration Baseline 12, 1966
Description:
Interferometer reports
Start Date:
1966-06-00
Gain Calibration Baseline 18, 1966
Description:
Interferometer reports
Start Date:
1966-06-00
Two Bit Correlator, 1966
Description:
Interferometer reports
Start Date:
1966-06-14
Correction of the InterferometerPhase for the Altitude Difference Effect, 1967
Description:
Interferometer reports
Start Date:
1967-12-18
Baseline Calibration for the Synthesis Program, 1968
Description:
Interferometer reports
Start Date:
1968-06-00
Line Interferometry, 1968
Description:
Interferometer reports
Start Date:
1968-08-01
Do Times Need to Be Corrected for Multiple Integrations for Big Fringe Periods?
Description:
Interferometer reports
Preliminary Results of the Pointing Measurements in the Summer of 1968
Description:
Interferometer reports
Start Date:
1968-11-00
Operation and Calibration of 85-1 Antenna Support Leg Temperature Monitor, 1968
Description:
Interferometer reports
Start Date:
1968-11-00
Thermal Effects of the 85' Telescope, Related to Pointing Errors, 1969
Description:
Interferometer reports
Start Date:
1969-04-00
An Analysis of the Errors in Interferometric Data, 1969
Description:
Interferometer reports
Start Date:
1969-05-00
One Bit Techniques, 1969
Description:
Interferometer reports
Start Date:
1969-07-30
Expansion of the Number of Avaliable Baselines, 1969
Description:
Interferometer reports
Start Date:
1969-09-29
Interferometer Correlator Gain Step Calibration
Description:
Interferometer reports
On the Selection of Pointing Calibrators, 1969
Description:
Interferometer reports
Start Date:
1969-10-30
Limitation in the Accuracy of the Pointing Procedure, 1969
Description:
Interferometer reports
Start Date:
1969-11-00
The Term 'AMPCOR' in the Dual-Frequency Interferometer Reduction Program and Auto Edit
Description:
Interferometer reports
Sensitivity of 2D H-line Synthesis Using the NRAO Interferometer, 1970
Description:
Interferometer reports
Start Date:
1970-11-03
Pointing of the 85ft Telescopes, 1971
Description:
Interferometer reports
Start Date:
1971-05-10
Listing of problems during run with H-line interferometer, 1971
Description:
Interferometer reports
Start Date:
1971-12-28
The Tape Recorder Interferometer and Small Diameter Radio Sources, 1972
Description:
Interferometer reports
Start Date:
1972-00-00
Site sidereal clock error, 1972
Description:
Interferometer reports
Start Date:
1972-05-12
An Improved Method for Pointing the 85-ft Antennas, 1972
Description:
Interferometer reports
Start Date:
1972-09-13
Polarization Properties of the 45' Telescope, 1973
Description:
Interferometer reports
Start Date:
1973-05-14
Updated List of Calibrators, 1973
Description:
Interferometer reports
Start Date:
1973-05-14
Report on Problems Encountered During the Recent Line Interferometer Observing Session, 1973
Description:
Interferometer reports
Start Date:
1973-10-10
The Four-Element NRAO Interferometer, a Preliminary Discussion, 1973
Description:
Interferometer reports
Start Date:
1973-11-01
Attempt to Detect Weak Absorption Features with the NRAO Interferometer Line System
Description:
Interferometer reports
Phase Stability of 35 km Baseline, 1974
Description:
Interferometer reports
Start Date:
1974-02-20
Interferometer Maintenance Logs, 1964-1966
Start Date:
1964-08-00
Telescope Operators Manual: DDP-116 Interferometer Computer, 1967
Start Date:
1967-01-03
Calibrations as of June 30, 1967
Description:
Charts and plots.
Start Date:
1967-06-30
Interferometer Failures and Replacements
Description:
Listings for 5 December 1967-30 December 1969.
Start Date:
1967-12-05
Programs for the Interferometer DDP-116 Computer, 1968
Start Date:
1968-00-00
Clark on hardware
Description:
Miscellaneous notes and memos on hardware, many undated
Start Date:
1970-00-00
Basic Instructions for Operating the Interferometer, 1975 revision
Description:
Revised version, July 1975. Original version March 1970, revised March 1971.
Start Date:
1975-07-00
Collection Tree
Papers of Barry G. Clark
Papers of Barry G. Clark > Green Bank Interferometer Series