Records of the NRAO > Photographs Series > GB Interferometer Unit

Collection Items

Green Bank Machine Shop, March 1964
Description: Machinery base - 85 foot
Start Date: 1964-03-04

Green Bank Interferometer, 1964
Description: Moving the Green Bank Interferometer [enhanced image]
Start Date: 1964-05-27

Green Bank Interferometer, 1964
Description: Moving the Green Bank Interferometer [original image]
Start Date: 1964-05-27

Green Bank Interferometer, 1964
Description: Green Bank Interferometer control room
Start Date: 1964-07-30

Green Bank Interferometer, 1964
Description: Moving the Green Bank Interferometer [cropped detail image]
Start Date: 1964-05-27

Green Bank Interferometer, 1964
Description: Moving the Green Bank Interferometer
Start Date: 1964-05-27

Green Bank Interferometer, 1964
Description: Green Bank Interferometer - close-up of wheels
Start Date: 1964-04-17

Green Bank Interferometer, 1964
Description: Green Bank Interferometer.
Start Date: 1964-03-17

Green Bank Interferometer, 1964
Description: Green Bank Interferometer, second element, 85-2. The telescope was mounted on rubber tires and was towed along a roadbed to move it from one antenna pad to another.
Start Date: 1964-03-17

Green Bank Interferometer, 1964
Description: Interferometer in snow
Start Date: 1964-02-26

Green Bank Interferometer, 1965
Description: Green Bank Interferometer, with 300 Foot Telescope to the left
Start Date: 1965-01-22

Green Bank Interferometer, 1965
Description: Green Bank Interferometer, with 300 Foot Telescope to the left
Start Date: 1965-01-22

Green Bank Interferometer, 1965
Description: Green Bank Interferometer, with 300 Foot Telescope to the left
Start Date: 1965-01-22

Green Bank Interferometer, 1965
Description: Green Bank Interferometer, with 300 Foot Telescope to the left
Start Date: 1965-01-22

Green Bank Interferometer, 1965
Description: 85-2, part of the Green Bank Interferometer
Start Date: 1965-09-15

Green Bank Interferometer, 1965
Description: Green Bank Interferometer, with 300 Foot Telescope to the left and 140 Foot Telescope in the left distance. 85-2 of the Interferometer sits on station 5 (2400 meters), having been moved there for the first time shortly before the photograph was…
Start Date: 1965-01-22

Green Bank Interferometer, 1965
Description: Green Bank Interferometer, with 300 Foot Telescope to the left and 140 Foot Telescope in the left distance
Start Date: 1965-01-22

Green Bank Interferometer, 1966
Description: Construction of 85-3, the third element of the Green Bank Interferometer
Start Date: 1966-11-04

Interferometer Focusing Ring, 1967
Description: Standing inside the Green Bank Interferometer focusing ring. Left to right: Jim Coe, John Matheny, Dick Skaggs (back to camera), Bud Arbogast, Bill Vraible.
Start Date: 1967

Green Bank Interferometer, 1968
Description: 82-2 and 85-3 from the southeast
Start Date: 1968-04-29

Green Bank Interferometer, 1968
Description: 85-2 and 85-3 from the northeast, 300 Foot Telescope in background
Start Date: 1968-04-29

Green Bank Interferometer, 1968
Description: 82-2 and 85-3 from the southeast
Start Date: 1968-04-29

Green Bank Interferometer from Buffalo Mountain, 1971
Description: Green Bank site from Buffalo Mountain: Green Bank Interferometer, 140 Foot Telescope and 300 Foot Telescope to the left [enhanced image]
Start Date: 1971-10-12

Green Bank Interferometer from Buffalo Mountain, 1971
Description: Green Bank site from Buffalo Mountain: Green Bank Interferometer, 140 Foot Telescope and 300 Foot Telescope to the left [original image]
Start Date: 1971-10-12

Green Bank Interferometer from Buffalo Mountain, 1971
Description: Green Bank site from Buffalo Mountain: Green Bank Interferometer [color cropped image]
Start Date: 1971-10-12

Green Bank Interferometer from Buffalo Mountain, 1971
Description: This is a photograph of the Green Bank 3-element Interferometer (GBI) looking from the west. The 300-ft and 140-ft telescopes are at left. The three telescopes of the GBI are, from front to back, the 85-2, the 85-3, and the 85-1 (Tatel Telescope).…
Start Date: 1971-10-12

Green Bank Interferometer, 1980
Description: Aerial view of Green Bank site showing 140 Foot, 300 Foot, and Interferometer
Start Date: 1980-02-07