Records of the NRAO > Photographs Series > 140 Foot Telescope Unit > 140 Foot Construction Subunit

Collection Items

Description: Album of 139 E.W. Bliss Company 8x10 b&w photos taken 1958-1961.
Start Date: 1958

Description: Album of 102 E.W. Bliss Company 8x10 b&w prints documenting fabrication and transport of components for the NRAO 140 Foot Telescope.
Start Date: 1959

Description: Album of b&w construction prints of the 140 Foot Telescope from the Early Historical Negatives collection.

Description: Album of b&w construction prints of the 140 Foot Telescope from the Historical Negatives collection.

140 Foot Construction
Description: E.W. Bliss Company model of the 140 foot telescope
Start Date: 1959

140 Foot Construction
Description: Construction of 140 foot telescope sphere in E.W. Bliss Company factory in Canton, Ohio
Start Date: 1959

140 Foot Construction
Description: Construction of 140 foot telescope sphere in E.W. Bliss Company factory in Canton, Ohio
Start Date: 1959

140 Foot Construction
Description: Moving a portion of the 140 foot telescope shaft onto a rail car for transport from E.W. Bliss Company factory in Canton, Ohio, to Green Bank
Start Date: 1959

140 Foot Construction
Description: Construction of 140 foot telescope yoke in E.W. Bliss Company factory in Canton, Ohio
Start Date: 1959

140 Foot Construction
Description: Construction of 140 foot telescope yoke in E.W. Bliss Company factory in Canton, Ohio
Start Date: 1959

140 Foot Construction
Description: E.W. Bliss Company engineers developing procedures for the superstructure lift on the 140 foot telescope
Start Date: 1959

140 Foot Construction
Description: Sections of the 140 foot telescope polar shaft on rail cars, ready for shipping from the E.W. Bliss Company factory in Canton, Ohio, to Green Bank, WV
Start Date: 1959

140 Foot Construction
Description: Transporting a portion of the E.W. Bliss 140 foot telescope shaft by road from the rail head at Bartow to the site in Green Bank
Start Date: 1959

140 Foot Construction
Description: Testing a mock-up of the 140 Foot Telescope bearing for clearance through Droop Mountain tunnel in 1961.
Start Date: 1905-05-14

140 Foot Construction
Description: Lifting the polar shaft and spherical bearing (covered with protective material) into place on the 140 Foot Telescope
Start Date: 1964

140 Foot Construction
Description: First move of the 140 Foot Telescope
Start Date: 1964-12

140 Foot Construction
Description: Final surface panel being set into place on the 140 Foot Telescope, December 1964.
Start Date: 1964-12

140 Foot Construction
Description: Installation of the hour angle drive gear
Start Date: 1964-10-19

140 Foot Construction
Description: 140 Foot Telescope construction. Dave Heeschen's Corvette in the foreground
Start Date: 1964-04-17

140 Foot Construction
Description: 140 Foot Telescope construction
Start Date: 1964-04-17

140 Foot Construction
Description: 140 Foot Telescope construction
Start Date: 1964-04-17

140 Foot Construction
Description: 140 Foot Telescope construction - drive
Start Date: 1964-12

140 Foot Construction
Description: 140 Foot Telescope construction - installing surface panels
Start Date: 1964-12

140 Foot Construction
Description: 140 Foot Telescope construction - panel damage
Start Date: 1964-11

140 Foot Construction
Description: 140 Foot Telescope construction - first surface panels installed
Start Date: 1964-11

140 Foot Construction
Description: 140 Foot Telescope construction - On November 4, 1964, after many weeks of preparation, the lift of the superstructure was started, the final large lift of the construction. It was witnessed by many people from NRAO and nearby areas. There was…
Start Date: 1964-11-04

140 Foot Construction
Description: 140 Foot Telescope construction - preparations for the lift into place of the yoke, November 1964. Filmmaker Peter B. Good documents the procedure
Start Date: 1964-11

140 Foot Construction
Description: 140 Foot Telescope construction - lift of the final yoke section with a connection ballast tank
Start Date: 1964

140 Foot Construction
Description: 140 Foot Telescope construction - lift of the first section of the yoke weighing almost 500 tons
Start Date: 1964

140 Foot Construction
Description: The 140 Foot Telescope bearing (upper left) and polar shaft after being bolted together in Green Bank
Start Date: 1963

140 Foot Construction
Description: The Stone & Webster design 17.5 foot diameter sphere for the 140 Foot Telescope being finished at the Westinghouse plant in Pittsburgh
Start Date: 1963

140 Foot Construction
Description: Aerial view of 140 Foot Telescope construction site in snow
Start Date: 1963-01-04

140 Foot Construction
Description: 140 Foot Telescope construction - Arrival of the final shaft in Green Bank in December 1963
Start Date: 1963

140 Foot Construction
Description: 140 Foot Telescope construction - backup structure on the ground in 1963
Start Date: 1963

140 Foot Construction
Description: 140 Foot Telescope construction site, superstructure on the ground at left
Start Date: 1963

140 Foot Construction
Description: 140 Foot Telescope construction - yoke being assembled on the ground, October 1963
Start Date: 1963

140 Foot Construction
Description: 140 Foot Telescope construction - yoke being assembled on the ground, October 1963
Start Date: 1963

140 Foot Construction
Description: 140 Foot Telescope construction - the 17.5 foot diameter spherical bearing leaving General Steel Industries at Eddystone PA, where it was cast in early 1963. With a weight of more than 350 tons, it was the largest nickel steel casting ever poured. …
Start Date: 1963

140 Foot Construction
Description: 140 Foot Telescope construction - backup structure nearing completion on the ground in 1963
Start Date: 1963

140 Foot Construction
Description: 140 Foot Telescope construction - spherical bearing being machined at Westinghouse in Pittsburgh
Start Date: 1963

140 Foot Construction
Description: 140 Foot Telescope construction - One half of the Bliss polar shaft being delivered to Green Bank in 1959. That shaft was eventually abandoned and later buried at the Green Bank site
Start Date: 1959

140 Foot Construction 301
Description: 140 Foot construction 301 - temporary polar shaft housing
Start Date: 1961-10-24

140 Foot Construction 300
Description: 140 Foot construction 300 - base
Start Date: 1961-10-24

140 Foot Construction 299
Description: 140 Foot construction 299 - base
Start Date: 1961-10-24

140 Foot Construction 298
Description: 140 Foot construction 298 - polar shaft inside temporary housing
Start Date: 1961-10-24

140 Foot Construction 297
Description: 140 Foot construction 297 - base, polar shaft, booms
Start Date: 1961-10-24

140 Foot Construction 296
Description: 140 Foot construction 296 - temporary polar shaft housing
Start Date: 1959-11-17

140 Foot Construction 295
Description: 140 Foot construction 295 - temporary polar shaft housing
Start Date: 1959-11-17

140 Foot Construction 294
Description: 140 Foot construction 294 - joining polar shaft
Start Date: 1959-10-28

140 Foot Construction 293
Description: 140 Foot construction 293 - polar shaft and structure
Start Date: 1959-10-28

140 Foot Construction 292
Description: 140 Foot construction 292 - approach to 140 foot
Start Date: 1959-10-28

140 Foot Construction 291
Description: 140 Foot construction 291 - polar shaft bearing
Start Date: 1959-10-20

140 Foot Construction 290
Description: 140 Foot construction 290 - polar shaft
Start Date: 1959-10-20

140 Foot Construction 289
Description: 140 Foot construction 289 - supports, polar shaft
Start Date: 1959-10-20

140 Foot Construction 288
Description: 140 Foot construction 288 - lug and bolt arrangement, polar shaft
Start Date: 1959-10-15

140 Foot Construction 287
Description: 140 Foot construction 287 - polar shaft supports
Start Date: 1959-10-15

140 Foot Construction 286
Description: 140 Foot construction 286 - supports, polar shaft
Start Date: 1959-10-15

140 Foot Construction 285
Description: 140 Foot construction 285 - line of sight in place, polar shaft
Start Date: 1959-10-15

140 Foot Construction 284
Description: 140 Foot construction 284 - polar shaft bearing bed
Start Date: 1959-10-15

140 Foot Construction 283
Description: 140 Foot construction 283 - polar shaft
Start Date: 1959-10-08

140 Foot Construction 282
Description: 140 Foot construction 282 - setting sections, polar shaft
Start Date: 1959-10-08

140 Foot Construction 281
Description: 140 Foot construction 281 - polar shaft
Start Date: 1959-10-08

140 Foot Construction 280
Description: 140 Foot construction 280 - joining polar shaft
Start Date: 1959-10-08

140 Foot Construction 279
Description: 140 Foot construction 279 - polar shaft section
Start Date: 1959-10-02

140 Foot Construction 278
Description: 140 Foot construction 278 - polar shaft at site
Start Date: 1959-10-02

140 Foot Construction 277
Description: 140 Foot construction 277 - second floor air conditioning unit
Start Date: 1959-09-03

140 Foot Construction 276
Description: 140 Foot construction 276 - air conditioning unit installation, first floor
Start Date: 1959-09-03

140 Foot Construction 275
Description: 140 Foot construction 275 - left boom wire supports
Start Date: 1959-09-03

140 Foot Construction 274
Description: 140 Foot construction 274 - top structure steel reinforcement
Start Date: 1959-09-03

140 Foot Construction 273
Description: 140 Foot construction 273 - three quarter aft view
Start Date: 1959-08-27

140 Foot Construction 272
Description: 140 Foot construction 272 - boom guy wires
Start Date: 1959-08-27

140 Foot Construction 271
Description: 140 Foot construction 271 - top structure
Start Date: 1959-08-27

140 Foot Construction 270
Description: 140 Foot construction 270 - front view
Start Date: 1959-08-27

140 Foot Construction 269
Description: 140 Foot construction 269 - top structure steel pattern
Start Date: 1959-08-25

140 Foot Construction 268
Description: 140 Foot construction 268 - general structure
Start Date: 1959-08-25

140 Foot Construction 267
Description: 140 Foot construction 267 - lift cables
Start Date: 1959-08-25

140 Foot Construction 266
Description: 140 Foot construction 266 - steel for super structure
Start Date: 1959-08-25

140 Foot Construction 265
Description: 140 Foot construction 265 - steel formation
Start Date: 1959-08-25

140 Foot Construction 264
Description: 140 Foot construction 264 - area view
Start Date: 1959-08-25

140 Foot Construction 263
Description: 140 Foot construction 263 - steel and cement level
Start Date: 1959-08-25

140 Foot Construction 262
Description: 140 Foot construction 262 - inside structure steel, top section
Start Date: 1959-08-20

140 Foot Construction 261
Description: 140 Foot construction 261 - aft side steel, top section
Start Date: 1959-08-20

140 Foot Construction 260
Description: 140 Foot construction 260 - side steel, top section
Start Date: 1959-08-20

140 Foot Construction 259
Description: 140 Foot construction 259 - corner steel, top section
Start Date: 1959-08-20

140 Foot Construction 258
Description: 140 Foot construction 258 - forward top deck
Start Date: 1959-08-20

140 Foot Construction 257
Description: 140 Foot construction 257 - aft top deck
Start Date: 1959-08-20

140 Foot Construction 256
Description: 140 Foot construction 256 - general view
Start Date: 1959-08-14

140 Foot Construction 255
Description: 140 Foot construction 255 - first floor air contitioning unit
Start Date: 1959-08-14

140 Foot Construction 254
Description: 140 Foot construction 254 - air conditioning unit, second floor
Start Date: 1959-08-14

140 Foot Construction 253
Description: 140 Foot construction 253 - shoring under top floor
Start Date: 1959-08-14

140 Foot Construction 252
Description: 140 Foot construction 252 - towers and wire
Start Date: 1959-08-14

140 Foot Construction 251
Description: 140 Foot construction 251 - side view
Start Date: 1959-08-10

140 Foot Construction 250
Description: 140 Foot construction 250 - top structure forms
Start Date: 1959-08-10

140 Foot Construction 249
Description: 140 Foot construction 249 - angle view
Start Date: 1959-08-10

140 Foot Construction 248
Description: 140 Foot construction 248 - top structure
Start Date: 1959-08-10

140 Foot Construction 247
Description: 140 Foot construction 247 - adding top structure
Start Date: 1959-08-06

140 Foot Construction 246
Description: 140 Foot construction 246 - elevator shaft
Start Date: 1959-08-06

140 Foot Construction 245
Description: 140 Foot construction 245 - casement for air conditioning unit
Start Date: 1959-08-06

140 Foot Construction 244
Description: 140 Foot construction 244 - top floor shoring
Start Date: 1959-08-06

140 Foot Construction 243
Description: 140 Foot construction 243 - access room
Start Date: 1959-08-06

140 Foot Construction 242
Description: 140 Foot construction 242 - steel pattern
Start Date: 1959-08-04

140 Foot Construction 241
Description: 140 Foot construction 241 - shoring
Start Date: 1959-08-04

140 Foot Construction 240
Description: 140 Foot construction 240 - shoring
Start Date: 1959-08-04

140 Foot Construction 239
Description: 140 Foot construction 239 - form shoring
Start Date: 1959-08-04

140 Foot Construction 238
Description: 140 Foot construction 238 - steel formation
Start Date: 1959-08-04

140 Foot Construction 237
Description: 140 Foot construction 237 - reinforcement steel
Start Date: 1959-08-04

140 Foot Construction 236
Description: 140 Foot construction 236 - opening forms
Start Date: 1959-07-24

140 Foot Construction 235
Description: 140 Foot construction 235 - form boxes
Start Date: 1959-07-24

140 Foot Construction 234
Description: 140 Foot construction 234 - center structure steel
Start Date: 1959-07-24

140 Foot Construction 233
Description: 140 Foot construction 233 - repair work on boom
Start Date: 1959-07-24

140 Foot Construction 232
Description: 140 Foot construction 232 - walkway
Start Date: 1959-07-24

140 Foot Construction 231
Description: 140 Foot construction 231 - walkway steel
Start Date: 1959-07-24

140 Foot Construction 230
Description: 140 Foot construction 230 - temproary shaft base
Start Date: 1959-07-21

140 Foot Construction 229
Description: 140 Foot construction 229 - floor steel
Start Date: 1959-07-21

140 Foot Construction 228
Description: 140 Foot construction 228 - cement pour, top level
Start Date: 1959-07-21

140 Foot Construction 227
Description: 140 Foot construction 227 - walkway structure
Start Date: 1959-07-21

140 Foot Construction 226
Description: 140 Foot construction 226 - steel rebar design
Start Date: 1959-07-21

140 Foot Construction 225
Description: 140 Foot construction 225 - pouring cement floor
Start Date: 1959-07-21

140 Foot Construction 224
Description: 140 Foot construction 224 - box design
Start Date: 1959-07-21

140 Foot Construction 223
Description: 140 Foot construction 223 - first floor stair landing
Start Date: 1959-07-16

140 Foot Construction 222
Description: 140 Foot construction 222 - entrance form
Start Date: 1959-07-16

140 Foot Construction 221
Description: 140 Foot construction 221 - temporary shaft bed
Start Date: 1959-07-16

140 Foot Construction 220
Description: 140 Foot construction 220 - general view showing contractor signs
Start Date: 1959-07-16

140 Foot Construction 219
Description: 140 Foot construction 219 - exterior rebar and forms
Start Date: 1959-07-09

140 Foot Construction 218
Description: 140 Foot construction 218 - interior tanks and pump
Start Date: 1959-07-09

140 Foot Construction 217
Description: 140 Foot construction 217 - exterior showing work area
Start Date: 1959-07-09

140 Foot Construction 216
Description: 140 Foot construction 216 - interior rebar and forms
Start Date: 1959-07-09

140 Foot Construction 215
Description: 140 Foot construction 215 - interior cement wall
Start Date: 1959-07-09

140 Foot Construction 214
Description: 140 Foot construction 214 - pouring cement
Start Date: 1959-07-02

140 Foot Construction 213
Description: 140 Foot construction 213 - rebar and forms
Start Date: 1959-07-02

140 Foot Construction 212
Description: 140 Foot construction 212 - pouring cement
Start Date: 1959-07-02

140 Foot Construction 211
Description: 140 Foot construction 211 - unloading cement bags
Start Date: 1959-07-02

140 Foot Construction 210
Description: 140 Foot construction 210 - excavated dirt
Start Date: 1959-07-02

140 Foot Construction 209
Description: 140 Foot construction 209 - top level rebar
Start Date: 1959-06-30

140 Foot Construction 208
Description: 140 Foot construction 208 - interior with piping
Start Date: 1959-06-30

140 Foot Construction 207
Description: 140 Foot construction 207 - exterior, front view
Start Date: 1959-06-17

140 Foot Construction 206
Description: 140 Foot construction 206 - interior with piping
Start Date: 1959-06-17

140 Foot Construction 205
Description: 140 Foot construction 205 - interior stairwell
Start Date: 1959-06-17

140 Foot Construction 204
Description: 140 Foot construction 204 - interior with piping
Start Date: 1959-06-17

140 Foot Construction 203
Description: 140 Foot construction 203 - interior with piping
Start Date: 1959-06-17

140 Foot Construction 202
Description: 140 Foot construction 202 - base with three levels
Start Date: 1959-06-17

140 Foot Construction 201
Description: 140 Foot construction 201 - base with three levels
Start Date: 1959-06-17

140 Foot Construction 200
Description: 140 Foot construction 200 - rebar and pipe
Start Date: 1959-06-15

140 Foot Construction 199
Description: 140 Foot construction 199 - closeup of floor opening
Start Date: 1959-06-15

140 Foot Construction 198
Description: 140 Foot construction 198 - top level covered with tarp
Start Date: 1959-06-15

140 Foot Construction 197
Description: 140 Foot construction 197 - top level covered with tarp
Start Date: 1959-06-12

140 Foot Construction 196
Description: 140 Foot construction 196 - base with three levels
Start Date: 1959-06-09

140 Foot Construction 195
Description: 140 Foot construction 195 - base with three levels
Start Date: 1959-06-09

140 Foot Construction 194
Description: 140 Foot construction 194 - top level covered with tarp
Start Date: 1959-06-09

140 Foot Construction 193
Description: 140 Foot construction 193 - rebar and forms for flooring
Start Date: 1959-06-03

140 Foot Construction 192
Description: 140 Foot construction 192 - pouring cement
Start Date: 1959-06-03

140 Foot Construction 191
Description: 140 Foot construction 191 - rebar and forms for flooring
Start Date: 1959-06-03

140 Foot Construction 190
Description: 140 Foot construction 190 - rebar and forms for flooring
Start Date: 1959-06-03

140 Foot Construction 189
Description: 140 Foot construction 189 - interior studs, rebar, cement
Start Date: 1959-06-03

140 Foot Construction 188
Description: 140 Foot construction 188 - interior studs and rebar
Start Date: 1959-06-03

140 Foot Construction 187
Description: 140 Foot construction 187 - trench with piping
Start Date: 1959-05-25

140 Foot Construction 186
Description: 140 Foot construction 186 - base exterior with forms and rebar
Start Date: 1959-05-25

140 Foot Construction 185
Description: 140 Foot construction 185 - base exterior with forms and rebar
Start Date: 1959-05-25

140 Foot Construction 184
Description: 140 Foot construction 184 - exterior rebar
Start Date: 1959-05-22

140 Foot Construction 183
Description: 140 Foot construction 183 - exterior rebar
Start Date: 1959-05-22

140 Foot Construction 182
Description: 140 Foot construction 182 - exterior rebar
Start Date: 1959-05-22

140 Foot Construction 181
Description: 140 Foot construction 181 - interior rebar
Start Date: 1959-05-18

140 Foot Construction 180
Description: 140 Foot construction 180 - exterior rebar
Start Date: 1959-05-18

140 Foot Construction 179
Description: 140 Foot construction 179 - interior rebar
Start Date: 1959-05-18

140 Foot Construction 178
Description: 140 Foot construction 178 - pouring concrete
Start Date: 1959-05-18

140 Foot Construction 177
Description: 140 Foot construction 177 - interior floor beams
Start Date: 1959-05-06

140 Foot Construction 176
Description: 140 Foot construction 176 - setting rebar
Start Date: 1959-05-06

140 Foot Construction 175
Description: 140 Foot construction 175 - interior studs
Start Date: 1959-05-01

140 Foot Construction 174
Description: 140 Foot construction 174 - interior studs and rebar
Start Date: 1959-05-01

140 Foot Construction 173
Description: 140 Foot construction 1973 - interior studs
Start Date: 1959-05-01

140 Foot Construction 172
Description: 140 Foot construction 172 - rebar
Start Date: 1959-05-01

140 Foot Construction 171
Description: 140 Foot construction 171 - work area on upper level
Start Date: 1959-05-01

140 Foot Construction 170
Description: 140 Foot construction 170 – interior with studs
Start Date: 1959-05-01

140 Foot Construction 169
Description: 140 Foot construction 169 – pipe in ditch to base
Start Date: 1959-05-01

140 Foot Construction 168
Description: 140 Foot construction 168 – pipes and junction box in ditch
Start Date: 1959-05-01

140 Foot Construction 167
Description: 140 Foot construction 167 - base with forms, masts, platform above front entrance, work shed and area
Start Date: 1959-04-28

140 Foot Construction 166
Description: 140 Foot construction 166 - base with forms, masts, platform above front entrance
Start Date: 1959-04-28

140 Foot Construction 165
Description: 140 Foot construction 165 - base with forms, masts, platform above front entrance
Start Date: 1959-04-28

140 Foot Construction 164
Description: 140 Foot construction 164 - base with forms, masts, platform above front entrance
Start Date: 1949-04-28

140 Foot Construction 163
Description: 140 Foot construction 163 - base with forms, masts, platform above front entrance
Start Date: 1959-04-24

140 Foot Construction 162
Description: 140 Foot construction 162 - base with forms, masts, platform above front entrance
Start Date: 1959-04-24

140 Foot Construction 161
Description: 140 Foot construction 161 – base with forms
Start Date: 1959-04-24

140 Foot Construction 160
Description: 140 Foot construction 160 – base with forms, masts, platform above front entrance
Start Date: 1959-04-21

140 Foot Construction 159
Description: 140 Foot construction 159 – base with forms, masts
Start Date: 1959-04-21

140 Foot Construction 158
Description: 140 Foot construction 158 – base with forms, masts
Start Date: 1959-04-21

140 Foot Construction 157
Description: 140 Foot construction 157 – platform above front entrance
Start Date: 1959-04-21

140 Foot Construction 156
Description: 140 Foot construction 156 - base with forms, masts, crane
Start Date: 1959-04-17

140 Foot Construction 155
Description: 140 Foot construction 155 - base with forms, masts, crane
Start Date: 1959-04-17

140 Foot Construction 154
Description: 140 Foot construction 154 – base with forms, masts, crane
Start Date: 1959-04-17

140 Foot Construction 153
Description: 140 Foot construction 153 – base with forms, masts, crane
Start Date: 1959-04-16

140 Foot Construction 152
Description: 140 Foot construction 152 – base with forms, masts, crane, sand pile
Start Date: 1959-04-16

140 Foot Construction 151
Description: 140 Foot construction 151 – base with forms, mast
Start Date: 1959-04-16

140 Foot Construction 150
Description: 140 Foot construction 150 – base with forms, masts
Start Date: 1959-04-16

140 Foot Construction 149
Description: 140 Foot construction 149 – mast base, crane
Start Date: 1959-04-16

140 Foot Construction 148
Description: 140 Foot construction 148 – base with forms, crane, masts
Start Date: 1959-04-14

140 Foot Construction 147
Description: 140 Foot construction 147 – base with forms, masts
Start Date: 1959-04-14

140 Foot Construction 146
Description: 140 Foot construction 146 – work on guy wires for masts
Start Date: 1959-04-14

140 Foot Construction 145
Description: 140 Foot construction 145 – base with forms, masts, workmen
Start Date: 1959-04-14

140 Foot Construction 144
Description: 140 Foot construction 144 – base with forms, masts
Start Date: 1959-04-09

140 Foot Construction 143
Description: 140 Foot construction 143 – base with forms, masts
Start Date: 1959-06-09

140 Foot Construction 142
Description: 140 Foot construction 142 – base with forms, crane, masts
Start Date: 1959-04-09

140 Foot Construction 141
Description: 140 Foot construction 141 – base with forms, crane, masts
Start Date: 1959-04-09

140 Foot Construction 140
Description: 140 Foot construction 140 – silhouette with masts
Start Date: 1959-04-09

140 Foot Construction 139
Description: 140 Foot construction 139 – base with forms crane, masts
Start Date: 1959-04-06

140 Foot Construction 138
Description: 140 Foot construction 138 – pipe in trench
Start Date: 1959-04-06

140 Foot Construction 137
Description: 140 Foot construction 137 – construction site, base, masts
Start Date: 1959-04-06

140 Foot Construction 136
Description: 140 Foot construction 136 – reinforcement steel
Start Date: 1959-04-06

140 Foot Construction 135
Description: 140 Foot construction 135 – distant shot, base, crane, masts
Start Date: 1959-04-01

140 Foot Construction 134
Description: 140 Foot construction 134 - polar shaft on rail car at Bartow
Start Date: 1949-04-01

140 Foot Construction 133
Description: 140 Foot construction 133 - polar shaft on rail car at Bartow
Start Date: 1949-04-01

140 Foot Construction 132
Description: 140 Foot construction 132 - polar shaft on rail car at Bartow
Start Date: 1949-04-01

140 Foot Construction 131
Description: 140 Foot construction 131 – polar shaft on rail car at Bartow
Start Date: 1949-04-01

140 Foot Construction 130
Description: 140 Foot construction 130 – base with forms, crane, masts
Start Date: 1949-04-01

140 Foot Construction 129
Description: 140 Foot construction 129 – base with forms, crane, masts
Start Date: 1959-04-01

140 Foot Construction 128
Description: 140 Foot construction 128 – base and masts
Start Date: 1959-03-27

140 Foot Construction 127
Description: 140 Foot construction 127 – distant shot
Start Date: 1959-03-27

140 Foot Construction 126
Description: 140 Foot construction 126 – three masts
Start Date: 1959-03-27

140 Foot Construction 125
Description: 140 Foot construction 125 – base with forms, crane, masts, work shed
Start Date: 1959-03-27

140 Foot Construction 124
Description: 140 Foot construction 124 – base with forms, crane, masts
Start Date: 1959-03-24

140 Foot Construction 123
Description: 140 Foot construction 123 – base with forms, crane, masts
Start Date: 1959-03-20

140 Foot Construction 122
Description: 140 Foot construction 122 – base with forms, crane, masts
Start Date: 1959-03-20

140 Foot Construction 121
Description: 140 Foot construction 121 – base with forms, crane, masts
Start Date: 1959-03-20

140 Foot Construction 120
Description: 140 Foot construction 120 – masts
Start Date: 1959-03-20

140 Foot Construction 119
Description: 140 Foot construction 119 – base with forms, crane, masts
Start Date: 1959-03-20

140 Foot Construction 118
Description: 140 Foot construction 118 – base with forms
Start Date: 1959-03-20

140 Foot Construction 117
Description: 140 Foot construction 117 – base with forms
Start Date: 1959-03-18

140 Foot Construction 116
Description: 140 Foot construction 116 – base with forms
Start Date: 1959-03-18

140 Foot Construction 115
Description: 140 Foot construction 115 – base showing front entrance, forms for next level
Start Date: 1959-03-18

140 Foot Construction 114
Description: 140 Foot construction 114 – base, crane, masts
Start Date: 1959-03-18

140 Foot Construction 113
Description: 140 Foot construction 113 – site from distance showing stabilizing for masts
Start Date: 1959-10-16

140 Foot Construction 112
Description: 140 Foot construction 112 – site from distance
Start Date: 1959-03-16

140 Foot Construction 111
Description: 140 Foot construction 111 – laying floor
Start Date: 1959-03-16

140 Foot Construction 110
Description: 140 Foot construction 110 – base, crane, masts
Start Date: 1959-03-16

140 Foot Construction 109
Description: 140 Foot construction 109 – base, crane, masts
Start Date: 1959-03-10

140 Foot Construction 108
Description: 140 Foot construction 108 – base showing entrance door
Start Date: 1959-03-10

140 Foot Construction 107
Description: 140 Foot construction 107 – base
Start Date: 1959-03-10

140 Foot Construction 106
Description: 140 Foot construction 106 – 140 foot site, base, mast, crane
Start Date: 1959-03-04

140 Foot Construction 105
Description: 140 Foot construction 105 – base with mast upright
Start Date: 1959-03-04

140 Foot Construction 104
Description: 140 Foot construction 104 – base with mast beside it
Start Date: 1959-02-26

140 Foot Construction 103
Description: 140 Foot construction 103 – mast construction
Start Date: 1959-02-26

140 Foot Construction 102
Description: 140 Foot construction 102 – base
Start Date: 1959-02-24

140 Foot Construction 101
Description: 140 Foot construction 101 - mast construction
Start Date: 1959-02-18

140 Foot Construction 100
Description: 140 Foot construction 100 - pouring cement, second level
Start Date: 1959-02-18

140 Foot Construction 99
Description: 140 Foot construction 99 - pouring cement, second level
Start Date: 1959-02-18

140 Foot Construction 98
Description: 140 Foot construction 98 - inside form
Start Date: 1959-02-18

140 Foot Construction, 97
Description: 140 Foot construction 97 - inside form
Start Date: 1959-02-17

140 Foot Construction 96
Description: 140 Foot construction 96 - second level wrapped
Start Date: 1959-02-17

140 Foot Construction 95
Description: 140 Foot construction 95 - forms and rebar with wrapping
Start Date: 1959-02-13

140 Foot Construction 94
Description: 140 Foot construction 94 - forms and rebar
Start Date: 1959-02-11

140 Foot Construction 93
Description: 140 Foot construction 93 - forms and rebar
Start Date: 1959-02-11

140 Foot Construction 92
Description: 140 Foot construction 92 - forms and rebar
Start Date: 1959-02-11

140 Foot Construction 91
Description: 140 Foot construction 91 - forms and rebar
Start Date: 1959-02-05

140 Foot Construction 90
Description: 140 Foot construction 90 - forms and rebar
Start Date: 1959-02-05

140 Foot Construction 89
Description: 140 Foot construction 89 - forms and rebar
Start Date: 1959-02-05

140 Foot Construction 88
Description: 140 Foot construction 88 - steel masts
Start Date: 1959-02-05

140 Foot Construction 87
Description: 140 Foot construction 87 - steel masts
Start Date: 1959-02-05

140 Foot Construction 86
Description: 140 Foot construction 86 - form and rebar
Start Date: 1959-02-05

140 Foot Construction 85
Description: 140 Foot construction 85 - form angle
Start Date: 1959-02-02

140 Foot Construction 84
Description: 140 Foot construction 84 - form angle
Start Date: 1959-02-02

140 Foot Construction 83
Description: 140 Foot construction 83 - form angle
Start Date: 1959-02-02

140 Foot Construction 82
Description: 140 Foot construction 82 - erecting forms for next elevation
Start Date: 1959-02-02

140 Foot Construction 81
Description: 140 Foot construction 81 - pouring cement
Start Date: 1959-01-29

140 Foot Construction 80
Description: 140 Foot construction 80 - pouring cement
Start Date: 1959-01-29

140 Foot Construction 79
Description: 140 Foot construction 79 - pouring cement
Start Date: 1959-01-29

140 Foot Construction 78
Description: 140 Foot construction 78 - pouring cement
Start Date: 1959-01-29

140 Foot Construction 77
Description: 140 Foot construction 77 - assembly, steel mast
Start Date: 1959-01-27

140 Foot Construction 76
Description: 140 Foot construction 76 - assembly, steel mast
Start Date: 1959-01-27

140 Foot Construction 75
Description: 140 Foot construction 75 - assembly, steel mast
Start Date: 1959-01-23

140 Foot Construction 74
Description: 140 Foot construction 74 - components on site
Start Date: 1959-01-23

140 Foot Construction 73
Description: 140 Foot construction 73 - laying floor steel
Start Date: 1959-01-23

140 Foot Construction 72
Description: 140 Foot construction 72 - base
Start Date: 1959-01-23

140 Foot Construction 71
Description: 140 Foot construction 71 - base
Start Date: 1959-01-20

140 Foot Construction 70
Description: 140 Foot construction 70 - base
Start Date: 1959-01-19

140 Foot Construction 69
Description: 140 Foot construction 69 - setting walkways
Start Date: 1959-01-15

140 Foot Construction 68
Description: 140 Foot construction 68 - outside view
Start Date: 1959-01-15

140 Foot Construction 67
Description: 140 Foot construction 67 - inside view, first floor
Start Date: 1959-01-15

140 Foot Construction 66
Description: 140 Foot construction 66 - walls wrapped
Start Date: 1959-01-13

140 Foot Construction 65
Description: 140 Foot construction 65 - walls wrapped
Start Date: 1959-01-09

140 Foot Construction 64
Description: 140 Foot construction 64 - cement pour completed and walls wrapped
Start Date: 1959-01-09

140 Foot Construction 63
Description: 140 Foot construction 63 - first wall cement pour
Start Date: 1959-01-08

140 Foot Construction 62
Description: 140 Foot construction 62 - close up shot of west wall cement pour
Start Date: 1959-01-08

140 Foot Construction 61
Description: 140 Foot construction 61 - pouring wall
Start Date: 1959-01-08

140 Foot Construction 60
Description: 140 Foot construction 60 - forms and rebar for above ground base
Start Date: 1959-01-07

140 Foot Construction 59
Description: 140 Foot construction 59 - inside form
Start Date: 1959-01-07

140 Foot Construction 58
Description: 140 Foot construction 58 - forms and rebar for above ground base
Start Date: 1959-05-01

140 Foot Construction 57
Description: 140 Foot construction 57 - forms and rebar for above ground base
Start Date: 1959-01-05

140 Foot Construction 56
Description: 140 Foot construction 56 - forms and rebar for above ground base
Start Date: 1958-12-30

140 Foot Construction 55
Description: 140 Foot construction 55 - forms for above ground base
Start Date: 1958-12-23

140 Foot Construction 54
Description: 140 Foot construction 54 - base with forms removed
Start Date: 1958-12-23

140 Foot Construction 53
Description: 140 Foot construction 53 - general view of activity pouring cement
Start Date: 1958-12-19

140 Foot Construction 52
Description: 140 Foot construction 52 - first cement pour for floor
Start Date: 1958-12-19

140 Foot Construction 51
Description: 140 Foot construction 51 - pouring floor
Start Date: 1958-12-19

140 Foot Construction 50
Description: 140 Foot construction 50 - setting floor steel
Start Date: 1958-12-19

140 Foot Construction 49
Description: 140 Foot construction 49 - setting floor steel
Start Date: 1958-12-16

140 Foot Construction 48
Description: 140 Foot construction 48 - floor steel reinforcement pattern
Start Date: 1958-12-16

140 Foot Construction 47
Description: 140 Foot construction 47 - basement, adding floor forms
Start Date: 1958-12-12

140 Foot Construction 46
Description: 140 Foot construction 46 - form covering
Start Date: 1958-12-12

140 Foot Construction 45
Description: 140 Foot construction 45 - putting in floor forms
Start Date: 1958-12-12

140 Foot Construction 44
Description: 140 Foot construction 44 - removing inside wall forms
Start Date: 1958-12-09

140 Foot Construction 43
Description: 140 Foot construction 43 - pouring north wall
Start Date: 1958-12-05

140 Foot Construction 42
Description: 140 Foot construction 42 - east wall looking west, vibrating east wall, pouring north wall
Start Date: 1958-12-05

140 Foot Construction 41
Description: 140 Foot construction 41 - pouring cement, general view from west side
Start Date: 1958-12-05

140 Foot Construction 40
Description: 140 Foot construction 40 - pouring basement wall, NW corner
Start Date: 1958-12-05

140 Foot Construction 39
Description: 140 Foot construction 39 - pouring east wall
Start Date: 1958-12-05

140 Foot Construction 38
Description: 140 Foot construction 38 - pouring north and south wall corners
Start Date: 1958-12-05

140 Foot Construction 37
Description: 140 Foot construction 37 - forms and rebar for base
Start Date: 1958-12-02

140 Foot Construction 36
Description: 140 Foot construction 36 - site of accident on 1 December 1958, two men hurt
Start Date: 1958-12-02

140 Foot Construction 35
Description: 140 Foot construction 35 - forms and rebar for base
Start Date: 1958-12-02

140 Foot Construction 34
Description: 140 Foot construction 34 - Pouring concrete, basement floor, temperature 42 deg
Start Date: 1958-11-26

140 Foot Construction 33
Description: 140 Foot construction 33 - forms and rebar for base
Start Date: 1958-11-26

140 Foot Construction 32
Description: 140 Foot construction 32 - forms and rebar for base
Start Date: 1958-11-24

140 Foot Construction 31
Description: 140 Foot construction 31 - forms and rebar for base
Start Date: 1958-11-21

140 Foot Construction 30
Description: 140 Foot construction 30 - forms and rebar for base
Start Date: 1958-11-21

140 Foot Construction 29
Description: 140 Foot construction 29 - forms and rebar for base
Start Date: 1958-11-21

140 Foot Construction 28
Description: 140 Foot construction 28 - forms and rebar for base
Start Date: 1958-11-20

140 Foot Construction 27
Description: 140 Foot construction 27 - forms and rebar for base
Start Date: 1958-11-19

140 Foot Construction 26
Description: 140 Foot construction 26 - forms and rebar for base
Start Date: 1958-11-18

140 Foot Construction 25
Description: 140 Foot construction 25 - forms and rebar for base
Start Date: 1958-11-18

140 Foot Construction 24
Description: 140 Foot construction 24 - forms and rebard for base
Start Date: 1958-11-13

140 Foot Construction 23
Description: 140 Foot construction 23 - rebar and forms for base
Start Date: 1958-11-13

140 Foot Construction 22
Description: 140 Foot construction 22 - rebar and forms for base
Start Date: 1958-11-12

140 Foot Construction 21
Description: 140 Foot construction 21 - rebar and forms for base
Start Date: 1958-11-11

140 Foot Construction 20
Description: 140 Foot construction 20 - rebar and forms for base
Start Date: 1958-11-07

140 Foot Construction 19
Description: 140 Foot construction 19 - rebar and forms for base
Start Date: 1958-11-07

140 Foot Construction 18
Description: 140 Foot construction 18 - rebar and forms for base
Start Date: 1958-11-06

140 Foot Construction 17
Description: 140 Foot construction 17 - rebar and forms for base
Start Date: 1958-11-06

140 Foot Construction 16
Description: 140 Foot construction 16 - rebar and forms for base
Start Date: 1958-11-04

140 Foot Construction 15
Description: 140 Foot construction 15 - rebar and forms for base
Start Date: 1958-11-04

140 Foot Construction 14
Description: 140 Foot construction 14 - assembling rebar
Start Date: 1958-11-03

140 Foot Construction 13
Description: 140 Foot construction 13 - rebar and forms for base
Start Date: 1958-11-03

140 Foot Construction 12
Description: 140 Foot construction 12 - assembling rebar
Start Date: 1958-11-03

140 Foot Construction 11
Description: 140 Foot construction 11 - forms for base
Start Date: 1958-10-30

140 Foot Construction 10
Description: 140 Foot construction 10 - forms for base
Start Date: 1958-10-30

140 Foot Construction 9
Description: 140 Foot construction 9 - laying footers
Start Date: 1958-10-29

140 Foot Construction 8
Description: 140 Foot construction 8 - laying footers
Start Date: 1958-10-29

140 Foot Construction 7
Description: 140 Foot construction 7 - laying footers
Start Date: 1958-10-28

140 Foot Construction 6
Description: 140 Foot construction 6 - laying footers
Start Date: 1958-10-28

140 Foot Construction 5
Description: 140 Foot construction 5 - laying footers
Start Date: 1958-28-10

140 Foot Construction 4
Description: 140 Foot construction 4 - laying footers
Start Date: 1958-10-27

140 Foot Construction 3
Description: 140 Foot construction 3 - excavation for base
Start Date: 1958-10-24

140 Foot Construction 2
Description: 140 Foot construction 2 - excavation for base
Start Date: 1958-10-24

140 Foot Construction 1
Description: 140 Foot construction 1 - start of excavation
Start Date: 1958-09-11

Collection Tree